A sector is listed because a system we built runs in it.

Where a sector is missing it is because we have nothing in production to point at, not because we would not take the work. Every cell below names the deployment it rests on.

Organisations we have delivered for
20+
Countries with systems in production
5
Industries with a system in production
7
  • Healthcare and MedTech

    Computer vision over clinical imaging, supporting a decision a clinician makes and remains responsible for.

    AI Healthcare

    EvidenceSurgical decision support with an orthopaedic practice in Boston, reading DICOM studies for preoperative planning and intraoperative guidance.
  • Manufacturing

    Production planning, inventory, procurement, finance and HR on one system, configured to the process the plant already runs.

    Guru ERP

    EvidenceGuru ERP across production, inventory, procurement, finance and HR on a plastics production floor in Riyadh, single facility.
  • Real Estate and Estate Management

    Estate operations where the resident and the operator are looking at the same record, not two versions of it.

    Estate Management

    EvidenceEstate management across multi-tower estates in Dhaka: visitor movement, resident services, billing and operational communication.
  • Retail and Hospitality

    Front-of-house transactions and back-office control on one platform, usable by staff on their first shift.

    Guru POSSalon POS

    EvidenceGuru POS across sales, inventory, staff and customer data, on the same codebase as Guru ERP. In production in Bangladesh and Australia.
  • Logistics, Ports and Terminals

    Gate, yard and equipment in one operational view, under continuous demand and with no window to take the system down.

    Terminal and Port Operations

    EvidenceTerminal and port software running in a live container terminal: position, movement, throughput and exceptions in real time.
  • Trading and Distribution

    Sales, procurement, accounts and tax on the operational control a factory system gives, under a different regulatory regime.

    Guru ERP

    EvidenceGuru ERP configured for a trading company in Dubai: sales, procurement, HRM, accounts and UAE VAT, on the same codebase as the Riyadh plant.
  • Public Sector and Infrastructure

    Municipal operations digitised end to end, working with the access control and payment hardware already installed on site.

    Smart Parking

    EvidenceSmart parking in Motijheel, Dhaka, with Dhaka South City Corporation, who are named here with their written permission.

Every sector, and the work under it.

The same engagements the case study index carries, arranged by sector. Nothing here is a second list. It is the same array read a different way.

ManufacturingRiyadh, Saudi Arabia

Three Arrow Plastics Factory Co

Guru ERP across production, inventory, procurement, finance and HR on a single facility, configured to the process the plant already ran.

ChallengeProduction planning, inventory, procurement, finance and HR each lived somewhere different, and none of them agreed.
ConstraintThe line does not stop. Every stage of the rollout had to be reversible.
ResultOne set of numbers for the floor and the office.
StatusIn production
Read the case study

TradingSaudi Arabia

AL Rukan Al Hassan Co

Guru ERP configured for trading: sales, procurement, HRM, accounts and VAT. Same codebase as the Riyadh plant, two industries.

ChallengeA trading operation needed the same operational control a factory system gives a plant.
ConstraintVAT had to be correct from the first invoice, not bolted on later.
ResultOne platform serving two operations that have almost nothing in common.
StatusIn production
Read the case study

HealthcareBoston, United States

AvailOrtho

Computer vision over DICOM studies, supporting orthopaedic surgical planning and intraoperative guidance.

ChallengePreoperative planning and intraoperative guidance depended on how carefully each surgeon read each study.
ConstraintIt complements the surgeon and never makes the call. Everything it surfaces traces back to the image it came from.
ResultDecision support the surgeon stays accountable for.
StatusIn production
Read the case study

Public SectorMotijheel, Dhaka

Dhaka South City Corporation

End-to-end digitisation of parking operations, with real-time space utilisation and vehicle movement.

ChallengeKerbside parking in one of the busiest commercial districts in Dhaka ran on manual collection and no record of what was where.
ConstraintPeak is eight in the morning, and it had to work with the access control and payment already installed rather than replace it.
ResultA live record of the district kerbside.
StatusIn production
Read the case study

LogisticsLive container terminal

A container terminal operator

Real-time yard, gate and equipment visibility in one operational view, under continuous operational demand.

ChallengeYard, gate and equipment were three separate pictures of the same operation, and none of them was current.
ConstraintNo maintenance window. It has to stay correct while ships are moving.
StatusIn production

RetailBangladesh

A service retail group

Guru POS on the same codebase as Guru ERP, so the till opens from the ERP dashboard rather than a second sign-in.

ChallengeSales, inventory, staff and customer records were reconciled by hand between the counter and the back office.
ConstraintUsable by frontline staff on their first shift, and controlled by management from the back office. Both, or it is not finished.
StatusIn production

Real EstateDhaka

A multi-tower estate operator

Property operations and resident experience on one platform.

ChallengeVisitor movement, resident services, billing and operational messaging ran on four different tools and one WhatsApp group.
ConstraintBilling and service tracking are visible to the resident, not only the operator. That is the difference between a management tool and a service.
StatusIn production

Retail

Classic Cut Boutique Salon

Salon POS running haircuts, treatments, beauty services and product sales through one connected system.

StatusIn production

All case studies

You do not need to arrive with a perfect technical specification.

Start with the problem. Tell us what is slowing the business down, what you want to build, or where the current system is failing. We will tell you the shortest path forward, including when that path is not us.

Start your build